1. Would it be a good idea for me to introduce a metal rooftop straight up and over of a black-top shingle rooftop? No. Why?

Untimely Failure: Metal has a serious level of warm development and withdrawal. As the rooftop warms up and chills off, it moves along the two its length and its width. Put straightforwardly against the granules on black-top shingle, this development will scratch the under of the board and ultimately uncover the exposed steel, accordingly possibly causing untimely disappointment for example consumption.
Voided Warranty:  Which is better metal or shingle roof The establishment of a metal board straight over top of a grating material, much of the time, voids the producer’s erosion guarantee (this would apply to Galvalume board just as electrifies steel doesn’t convey a consumption guarantee).
Shape: The board will take the state of the fundamental lopsided surface and, as a rule, make shape issues noticeable that were recently covered up.
2. Consider the possibility that I set out an underlayment prior to putting the metal rooftop on.
This is surely a superior choice, yet you will in any case have similar worries as to Shape (see above) and, should the underlayment erode or tear and open the metal to the black-top shingle, there exists the potential for Premature Failure which would bring about a Voided Warranty.
Assuming it is concluded that this will be the establishment strategy, suggested underlayments would be Grace Tri-Flex and IKO RoofGard. They are impenetrable to dampness and exceptionally tear safe. MMR doesn’t suggest the utilization of 15# or 30# material felt (tar paper) for this application.
3. Does that mean I ought to strip all black-top shingle rooftops prior to laying metal down? No. MMR suggests the depriving of the current black-top shingles, but we comprehend that time and spending plan limitations don’t necessarily in every case collaborate. Here is the suggested best practice for re-material over a black-top shingle rooftop:
Rooftop Deck: Inspect the current shingle rooftop to decide whether it is reasonable as a boundary against buildup. Recollect that a metal rooftop will, somewhat, foster buildup on the underside of the boards. Those regions that give indications of past water penetration (basic sheathing is delicate or light) or harm (missing or decayed shingles) ought to be fixed likewise and delivered watertight with the utilization of ice and water safeguard and a fitting sealant (if essential).
Edges and Hips: Remove the cap shingles to try not to have a protuberance. Assuming allowing to be uncovered with the danger of downpour/snow, cover with canvas or rooftop underlayment.
Rooftop Edges: Cut the overhanging black-top shingles flush with the sash/rake sheets. This will likewise eliminate the current trickle edge. This permits you to introduce your eave/rake trim consistent with the house with a spotless, tight fit to the sash sheets.
Firring(strapping):
Hips, Ridge and All Protrusions: 9 – 12 creeps of width on all sides of utilizing pressed wood, OSB or comparative decking (thickness to match other timber).
Valleys: 16 – 24 crawls of width on either side utilizing pressed wood, OSB or comparative decking (thickness to match other timber).
Peak and Eave Edges: 1″ X 3″ tidy firring or comparable aspect light measure steel outlining, put off from edge by ” – ” so it doesn’t throw the trim out.
Inside of Roof Deck: 1″ X 3″ tidy firring or comparative aspect light measure steel outlining, introduced evenly roughly 16″ OC (utilize each second course of shingles are your aide).
4. Every one of this sounds like a ton of work. For what reason don’t I simply strip the rooftop? That is a substantial remark and numerous workers for hire/mortgage holders choose to do exactly that. Here are contemplations for the two choices:
Leave Existing Roof In Place:

Genius: No need to pay for dump expenses;
Expert: No need to pay for new rooftop underlayment inasmuch as existing rooftop is reasonable as an obstruction against buildup;
Ace: If utilizing firring, makes an air boundary between the metal board and the rooftop. This permits buildup that creates on the underside of the board to dry all the more rapidly;
Expert: If utilizing firring, diminishes warm exchange to the fundamental rooftop deck as the metal board is sitting up off the black-top shingle;
Expert: If utilizing firring, takes into consideration a practical evening out of the rooftop surface whenever required;
Ace: Reduces the weight put on landfills every year;
Con: Does not permit an exhaustive investigation of the rooftop deck before putting in new rooftop.;
Con: Renders the establishment of snow monitors more troublesome and possibly less secure;
Unbiased: Not acknowledged by all building regulations (storm inclined regions expect establishment to strong deck utilizing explicit UL-90 appraised cuts).
Eliminate Existing Roof:
Expert: Allows you to examine the state of the rooftop deck and make fixes on a case by case basis;
Ace: Provides for a smooth, level rooftop surface on which to introduce;
Expert: Allows for the legitimate and careful establishment of an ice and water safeguard;
Genius: Allows a strong and uniform surface into which snow watchmen can be secured whenever required;
Ace: Provides a strong surface for all clasp;
Con: Added costs through dump and removal expenses;
Con: Added costs through new rooftop underlayment.